Offshore Construction Specialists (OCS)

    V Filanovoskogo Phase 11 (Filanovsky)

    V Filanovoskogo Phase 11 (Filanovsky)

    The V. Filanovsky oil field is located in the territory of the licensed site “Severniy” in the Russian area of the northern part of the Caspian Sea, in shallow waters. Lukoil awarded the Floatover installation of 2 topsides to Caspian Hydra Technologies (CHT). CHT awarded the construction management and installation engineering of the Floatover of the two topsides to OCS.

    V Filanovoskogo Phase 11 (Filanovsky)

    Read more

    Zawtika Development Project, Phase 1A

    Zawtika Development Project, Phase 1A

    PTTEP has awarded the contract for the Zawtika Wellhead Platform 1, 2 and 3 with Sealines to Larsen & Toubrowith the contract amount over USD$ 200 million. Larsen & Toubro has awarded the "Project and Construction Management including Installation Engineering for Offshore Installation" scope of works to OCS. The scope included 3 Jackets ( Launch / 150m WD), 3 topsides and 3 infield pipelines.

    Zawtika Development Project, Phase 1A

    Read more

    Madura BD Field Development – BD Shore Approach

    Madura BD Field Development - BD Shore Approach

    Husky-CNOOC Madura Ltd awarded the Madura Field Development project to PT Timas Suplindo. Pt Timas awarded the pre and post trenching of the 16” pipeline (5.5km) to OCS. This was the first Lumpsum project of significant value taken up by OCS.

    Madura BD Field Development - BD Shore Approach

    Read more

    McConnell Dowell Constructors – MCJV Narrows Pipepull

    McConnell Dowell Constructors - MCJV Narrows Pipepull

    MCJV was awarded a contract with QGC for the installation of two (2) 42" (DN1050) pipelines with 100mm concrete thickness from the Queensland coal seam gas fields in the Surat Basin to the Curtis Island LNG facility near Gladstone, Queensland.MCJV awarded the Engineering, Eontruction Management and Buoy Fabrication to OCS.

    McConnell Dowell Constructors - MCJV Narrows Pipepull

    Read more

    Korchagina Phase II Construction

    Korchagina Phase II Construction

    The V. Filanovsky oil field is located in northern part of the Caspian Sea, in shallow waters. Lukoil awarded the Installation of substructure and Floatover of 1 topside to Caspian Hydra Technologies (CHT). CHT awarded the construction management and installation engineering of the above scope to OCS.

    Korchagina Phase II Construction

    Read more

    Nand Gaurav Barge Conversion

    Nand Gaurav Barge Conversion

    Essar Offshore Subsea Limited (EOSSL) awarded the Conceptualisation and Engineering to convert their hook up and lift barge ‘Nand-Gaurav’ to “pipe Lay Barge”. OCS scope included the pipe lay system including conveyors, rollers, tensioner and a bespoke floating stinger design.

    Nand Gaurav Barge Conversion

    Read more

    Kangean Energy Indonesia Limited – TSB Development Project

    Kangean Energy Indonesia Limited - TSB Development Project

    Kangean Energy Indonesia Ltd, the operator of the Kangean PSC awarded the TSB Development project to Pt Timas Suplindo. PT Timas awarded the Construction Management and Installation Engineering of this project to OCS. The scope included installation of Rigid Pipelines, Flexibles and subsea manifolds and hot tap at a water depth of 100m

    Kangean Energy Indonesia Limited - TSB Development Project

    Read more

    Furie Kitchen Light Project

    Furie Kitchen Light Project

    In late summer 2015, Crowley’s Marine Solutions team has successfully completed the installation of Furie’s Kitchen Lights Natural Gas Production Platform and underwater Pipeline in Cook Inlet, AlaskaThe Project was extremely challenging with a short weather window and difficulties with the harsh Arctic environment. The tides in Cook Inlet changes by up to 35 feet every 6 hours causing extreme currents of 7 knots. OCS was engaged by Crowley Marine Solution for the Construction Management and Installation Engineering for the installation of the King Pile Template, Pile driving platform, chaser piles, installation aids and pipeline. The scope also included the fabrication of the driving template.

    Furie Kitchen Light Project

    Read more

    Jangkrik 2 Jetting

    Jangkrik 2 Jetting

    The JKK Complex is located in the Muara Bakau PSC permit area, approximately 70km off the coast of Makassar Strait, Offshore Borneo of Indonesia. Water depths in Jangkrik Complex are ranging from 200 to 500m.ENI awarded Technip the scope of provision and installation of pipeline, risers, flowlines and onshore receiving facility (orf), installation of umbilicals, manifold, jumpers and subsea controls system, offshore hook-up and offshore commissioning for jangkrik (jkk) and jangkrik north east (jne) field development.Technip awarded the burial of the Jangkrik 24”/4” (piggyback) subsea pipelines from KP 27.733 to KP 38.990 to OCS. Trenching water depth is 45m using the Bourbon vessel SURF Allamanda. The operation was performed completely diverless.

    Jangkrik 2 Jetting

    Read more