    Working with PT Timas OCS provided the installation management, engineering and planning; including vessel selection, chartering and offshore execution for Conoco Phillips North Belut CPP to WHP-C Subsea Cable.(site location North Belut Field, Natuna Sea).

    Scope of work Summary

    • Detailed installation engineering for installation of the subsea cable between North Belut CPP and WHP-C platforms.
    • Interfacing with Client and its Subcontractors PTMI, PTTI and Sarku maintaining a strict installation window.
    • Commissioning of the construction of a specifically designed hub driven spooler with constant tension designed to handle ten metre diameter reels.
    • Construction Engineering for the Transportation and Installation of the Cable.
    • Chartering of and rig up of installation vessel Seacor Canyon with trenching spread.
    • Transportation of the Cable from its fabrication yard in Batam to site to Singapore and rig up.
    • Installation of the Cable between the existing facilities.
    • Trenching of cable to prescribed depth.
    • Testing of the completed cable.
    • Complete offshore execution was done without incident and ahead of schedule ensuring a positive outcome for all parties.