Offshore Construction Specialists (OCS)

    OCS provided the installation management, engineering and planning; including vessel selection, chartering and offshore execution for Conocophillips North Belut CPP Connecting Bridge Installation (site location North Belut Field, Natuna Sea).

    • Detailed installation engineering for installation of the CPP Connecting Bridge between the North Belut CPP and WHP-D platforms.
    • Interfacing with Client and its Subcontractors PTMI, PTTI, Saipem and Sarku maintaining a strict installation window.
    • Construction Engineering for the Transportation and Installation of the Bridge.
    • Transportation of the Bridge from its fabrication yard in Batam to site in Natuna.
    • Installation of the Bridge between the existing facilities.
    • Complete offshore execution was done without incident and ahead of schedule ensuring a positive outcome for all parties.