    Provide Engineering and Project Management for the following work scope (site location Ujung Pangkah, offshore Gresik) :

    • Detail engineering for three Flowlines (approximately 5.5 km long each) - 16” Gas line, 12” Liquid Line and 6” Gas Lift line. From WHP-A (existing) to new WHP-B.
    • Management of pipeline coating for FBE, Neoprene and concrete weight coat.
    • Construction Engineering for the Transportation and Installation of the three Flowlines and WHP-B platform.
    • Transportation and Installation of three Flowlines (including post trenching burial, pigging and hydrotesting, dewatering, drying and nitrogen packing).
    • Transportation of WHP-B platform comprising one 370mT, eight-legged jacket, three section piles and 1500mT Topside.
    • Installation of WHP-B platform comprising one 370mT, eight-legged jacket, three section piles and 1500mT Topside.