    Working with EOCP, OCS provided the installation management, engineering and planning for Emas Offshore Construction and Production (EOCP) , contracted by Oil Search (Papua New Guinea) Limited to perform the life extension works for KUMUL field off Gulf Of Papua New Guinea.

    osl1

    The life extension works involve the following:

    • Kumul Terminal Rejuvenation
    • Installation of 7.7km of 20’’ rigid Tanker Loading Line between the KMT and PLEM (45MT) associated riser and riser guard (.45MT).
    • Installation of Pipeline Tie-In Spool.
    • Precommissioning of Tanker Loading Line.
    • Installation of new CALM Buoy (450MT) system c/w mooring system ( 6 nos of 42” x 20m anchor piles with chains)
    • Installation of 2 lengths of 12” under buoy hoses from Calm Buoy to PLEM and 1 length of 12” floating hose.
    • Stabilization of existing Export Pipeline and Tanker Loading Line.
    • Decommissioning of the existing CALM Buoy, PLEM, Riser and Pipeline.

    All installation works were carried out using EOCP construction barge “Lewek Champion”.